{"id":73912,"date":"2025-05-09T10:37:37","date_gmt":"2025-05-09T09:37:37","guid":{"rendered":"https:\/\/www.cm-evora.pt\/?p=73912"},"modified":"2025-05-09T10:39:30","modified_gmt":"2025-05-09T09:39:30","slug":"ja-comecaram-os-trabalhos-de-remodelacao-da-rede-de-agua-e-instalacao-de-esgotos-pluviais-em-s-mancos","status":"publish","type":"post","link":"https:\/\/www.cm-evora.pt\/en\/ja-comecaram-os-trabalhos-de-remodelacao-da-rede-de-agua-e-instalacao-de-esgotos-pluviais-em-s-mancos\/","title":{"rendered":"J\u00c1 COME\u00c7ARAM OS TRABALHOS DE REMODELA\u00c7\u00c3O DA REDE DE \u00c1GUA E INSTALA\u00c7\u00c3O DE ESGOTOS PLUVIAIS EM S. MAN\u00c7OS"},"content":{"rendered":"<p>A obra que tinha sido apresentada \u00e0 popula\u00e7\u00e3o no final de abril passado, teve ontem condi\u00e7\u00f5es para ser iniciada (08\/05\/2025). Come\u00e7aram os trabalhos de abertura de valas e instala\u00e7\u00e3o das novas condutas de \u00e1gua, seguindo-se os coletores de pluviais.<\/p>\n<p>H\u00e1 muito esperada pela popula\u00e7\u00e3o devido ao estado de degrada\u00e7\u00e3o das canaliza\u00e7\u00f5es, esta obra vai traduzir-se na remodela\u00e7\u00e3o da rede p\u00fablica de distribui\u00e7\u00e3o de \u00e1gua e instala\u00e7\u00e3o de coletores pluviais na zona oeste da povoa\u00e7\u00e3o entre as ruas Dr. Barahona, Av.\u00aa Eng.\u00ba Vasco Almeida Conde de Vilalva, Rua da Igreja e Largo da Igreja e arruamentos envolventes.<\/p>\n<p>Para al\u00e9m das condutas, est\u00e1 programada a substitui\u00e7\u00e3o integral dos ramais domicili\u00e1rios, o que tornar\u00e1 poss\u00edvel a melhoria das condi\u00e7\u00f5es de fornecimento de \u00e1gua quer na qualidade, quer na press\u00e3o nas torneiras. No que respeita \u00e0 drenagem de \u00e1guas residuais, sendo o sistema existente do tipo unit\u00e1rio, recolhe em conjunto as \u00e1guas residuais dom\u00e9sticas e pluviais com destino final para a ETAR da povoa\u00e7\u00e3o. Atrav\u00e9s da instala\u00e7\u00e3o de um sistema aut\u00f3nomo de pluviais, que agora se ir\u00e1 concretizar, o caudal afluente \u00e0 ETAR ser\u00e1 reduzido, com consequente al\u00edvio da fatura\u00e7\u00e3o e longevidade dos equipamentos instalados.<\/p>\n<p>O valor total do investimento rondar\u00e1 os 300.000 euros para um prazo de execu\u00e7\u00e3o de seis meses. Esta verba ser\u00e1 assegurada pelo or\u00e7amento municipal, prevendo-se, no entanto, a obten\u00e7\u00e3o de financiamento poss\u00edvel at\u00e9 85%, a obter atrav\u00e9s de candidatura ao Programa Alentejo 2030 \u2013 Ciclo Urbano da \u00c1gua.<\/p>\n<p>O desenvolvimento da obra ir\u00e1 implicar inevit\u00e1veis constrangimentos, quer em cortes tempor\u00e1rios no abastecimento de \u00e1gua, quer em restri\u00e7\u00f5es na circula\u00e7\u00e3o rodovi\u00e1ria. A C\u00e2mara Municipal pede a compreens\u00e3o dos moradores e utentes das vias intervencionadas, e solicita a m\u00e1xima precau\u00e7\u00e3o na circula\u00e7\u00e3o, acatando sempre as indica\u00e7\u00f5es dos respons\u00e1veis nos locais onde est\u00e3o a decorrer os trabalhos.<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-73912 gallery-columns-3 gallery-size-full'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1228\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3-300x192.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3-1024x655.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3-768x491.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3-1536x982.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-3-1320x844.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4-300x200.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4-1024x683.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4-768x512.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4-1536x1024.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-4-1320x880.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5-300x200.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5-1024x683.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5-768x512.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5-1536x1024.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-5-1320x880.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6-300x200.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6-1024x683.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6-768x512.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6-1536x1024.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-6-1320x880.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1228\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7-300x192.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7-1024x655.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7-768x491.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7-1536x982.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-7-1320x844.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-300x200.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1024x683.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-768x512.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1536x1024.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1320x880.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1-300x200.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1-1024x683.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1-768x512.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1-1536x1024.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-1-1320x880.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2.jpg 1920w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2-300x200.jpg 300w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2-1024x683.jpg 1024w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2-768x512.jpg 768w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2-1536x1024.jpg 1536w, https:\/\/www.cm-evora.pt\/wp-content\/uploads\/2025\/05\/2025_05_08-HO-Remod-Redes-Agua-e-Esgos-S-Mancos-2-1320x880.jpg 1320w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a>\n\t\t\t<\/dt><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>A obra que tinha sido apresentada \u00e0 popula\u00e7\u00e3o no final de abril passado, teve ontem condi\u00e7\u00f5es para ser iniciada (08\/05\/2025). Come\u00e7aram os trabalhos de abertura de valas e instala\u00e7\u00e3o das novas condutas de \u00e1gua, seguindo-se os coletores de pluviais. H\u00e1 muito esperada pela popula\u00e7\u00e3o devido ao estado de degrada\u00e7\u00e3o das canaliza\u00e7\u00f5es, esta obra vai traduzir-se [&hellip;]<\/p>\n","protected":false},"author":46,"featured_media":73919,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2110],"tags":[],"class_list":["post-73912","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":{"imagens":"","destaq_image":73919,"titulo_docs_seccao":"","documentos":""},"_links":{"self":[{"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/posts\/73912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/users\/46"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/comments?post=73912"}],"version-history":[{"count":1,"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/posts\/73912\/revisions"}],"predecessor-version":[{"id":73921,"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/posts\/73912\/revisions\/73921"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/media\/73919"}],"wp:attachment":[{"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/media?parent=73912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/categories?post=73912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cm-evora.pt\/en\/wp-json\/wp\/v2\/tags?post=73912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}